Roads and Transportation
All Hanover County public roads and bridges (outside of the Town of Ashland) are operated and maintained by the Virginia Department of Transportation. VDOT also maintains roadside ditches, performs snow removal functions and builds new roads with money allocated by the Commonwealth Transportation Board.
On VDOT’s Work Request page you can submit a request to have a road repaired, to remove something from a road, to have signs or traffic devices repaired, to request new signs or traffic devices, to submit a claim or to ask for more information. This page can also be used to submit snow plowing-related complaints.
Problems with VDOT roads can be reported to their Customer Service Center at 1-800-367-7623 around the clock. TTY users can call 711.
If you have a unique road or drainage problem or other questions and need help determining the appropriate agency contact, you can call the Hanover County Department of Public Works at 804-365-6181 and they will help you.
County-Administered Road Projects
- Atlee Station Road Widening (Phase 2)
Estimated Cost: $27.2M
Estimated Completion: 2028
Project Manager: Terry Knouse, PE; 804-365-3266; [email protected]
- 10% Plan Development
- Citizen Information Meeting (5-4-22)
- Cool Spring Elementary School Pedestrian Improvement
Estimated Cost: $253.7K
Estimated Completion: 2027
Project Manager: Ross Ward, PE; 804-365-3425; [email protected]
- Lewistown Road / Ashcake Road Intersection Improvement
Estimated Cost: $5.7M
Estimated Completion: 2026
Project Manager: Terry Knouse, PE; 804-365-3266; [email protected]
- Pole Green Road Widening
Estimated Cost: $20.7M
Estimated Completion: 2027
Project Manager: Joe Vidunas; 804-365-6176; [email protected]
- Citizen Information Meeting (10-27-20)
- 30% Plan (9-2-21) (PDF)
- Citizen Information Meeting (9-13-21)
- 60% Plan (3-3-22) (PDF)
- Public Hearing (4-25-22)
- Route 1 / Route 30 Signalized Continuous Green-T Intersection Improvement
Estimated Cost: $5.2M
Estimated Completion: 2026
Project Manager: Terry Knouse, PE; 804-365-3266; [email protected]
- Route 301 Additional 3rd Southbound Lane
Estimated Cost: $1.3M
Estimated Completion: 2024
Project Manager: Terry Knouse, PE; 804-365-3266; [email protected]
- Route 360 / Lee Davis Road Widening
Estimated Cost: $29.7M
Estimated Completion: 2025
Project Manager: Joe Vidunas; 804-365-6176; [email protected]
- Route 360 Bus. / Atlee Road / Cold Harbor Road Intersection Improvement
Estimated Cost: $6.5M
Estimated Completion: 2026
Project Manager: Terry Knouse, PE; 804-365-3266; [email protected]
- Sliding Hill / New Ashcake Road Signalized Continuous Green-T Intersection Improvement
Estimated Cost: $694.0K
Estimated Completion: June 2022
Project Manager: Randy Hardman, PE; 804-365-6376; [email protected]
- Sliding Hill Road Widening Pedestrian Improvement
Estimated Cost: $413.5K
Estimated Completion: 2022
Project Manager: Randy Hardman, PE; 804-365-6376; [email protected]
Following the completion of the Sliding Hill Road widening project in December 2020, VDOT and FHWA directed the County to make certain pedestrian modifications and improvements as detailed in the linked plan set. Construction is planned in 2022 once all necessary right-of-way and easements have been acquired.
Quick Links
- Proposed Through Truck Restrictions Update - Sliding Hill Road Area Roads
- Quarterly Road Project Status Report
- 2021 Candidate (Road) Project List (PDF)
- Hanover Road Project Funding Plan (Adopted 10-13-21)
- 2013 Transportation Policy (Adopted 5-22-13) (PDF)
- 2016 Business and Residential Development Road Improvements Transportation Policy (Adopted 6-27-16) (PDF)
- Richmond Region Projects (VDOT Listing)
- Richmond Regional TPO Long Range Transportation Plan (LRTP)
- Secondary Six-Year Plan (SSYP)
- Transportation Improvement Program (TIP)
- VDOT Resurfacing and Pavement Information
-
J. Michael Flagg
DirectorPhone: 804-365-6181
-
Public Works
Physical Address
7516 County Complex Road
Hanover, VA 23069
Phone: 804-365-6181
Hours
Monday - Friday
8:30 AM - 5:00 PM